Shape the Future of Transportation in Belmont

Help us create safer streets, better transit, and more connected communities. Your voice guides the Transportation Master Plan.

About the Plan

Building a Multimodal Future

The City of Belmont is developing a Transportation Master Plan that reimagines how people move — making streets safer, connections easier, and everyday trips more reliable whether traveling on foot, by bike, on transit, or by car. The plan will identify gaps in the transportation network and set a clear path for future investments that help the community move more seamlessly.

In the Community

Events

Come talk to us at these upcoming events:

  • Belmont Farmer's Market

    9 AM – 1 PMPast event
  • Belmont Public Library

    2 – 5 PMPast event
  • Belmont Public Library

    11 AM – 2 PMPast event
  • Belmont Centennial Festival

    1:30 PMPast event
  • Belmont Farmer's Market

    9 AM – 1 PM
Interactive Map

Explore Belmont's Transportation Network

Click anywhere on the map to drop a pin and share a concern or idea for that location. Your comments are important and will help inform the priorities considered in the Transportation Master Plan.

Communication

Stay Connected

Get project milestones, event announcements, and survey opportunities by email.

Timeline

Project Schedule

How the plan comes together, from the community survey to the final report at City Council.

Project schedule from Fall 2026 through Spring 2028. Community outreach and stakeholder engagement runs across the whole project: community survey, Round 1 engagement for needs assessment and stakeholder meetings in Fall 2026; stakeholder meetings in Winter 2026; Round 2 engagement to review recommendations and stakeholder meetings in Spring 2027; stakeholder meetings in Fall 2027. Analysis and recommendations: analyze needs and develop recommendations from Winter 2026 to Spring 2027, refine recommendations in Summer 2027, develop report in Fall 2027, refine report through Spring 2028. Draft TMP report is presented at City Council meeting #1 in Fall 2027 and the final TMP report at City Council meeting #2 in Winter 2027.
Scenario Planner

What Happens When We Invest in Transportation?

Adjust the sliders to model how different infrastructure investments could affect air quality, public health, and safety in Belmont.

Infrastructure Investment Levels

Current: 5.5 mi bikeways (mostly unprotected) → Add protected lanes
Current: 59% coverage → Close sidewalk gaps citywide
Increased SamTrans + Caltrain frequency and coverage
Speed tables, curb extensions, and narrowed lanes in school zones and residential areas
Adaptive signals with transit priority and ped detection

Projected Community Impact

CO₂ Reduction

1,240 tons/yr

Air Quality Improvement (PM2.5)

8%

Residents Meeting Activity Guidelines

+2,100

Vehicle Miles Traveled Reduction

-3.2%

Traffic Injury Reduction

-18%

$2.8M

Annual Health Savings

1,400

New Daily Active Trips

1,240

Tons CO₂ Reduced/Yr

These estimates are modeled based on published transportation planning research including FHWA Complete Streets guidance, CDC physical activity studies, and EPA vehicle emissions factors. Actual outcomes will depend on implementation specifics and community behavior changes.
Document Library

Plans & Studies Informing the TMP

The Transportation Master Plan builds on decades of planning work. Explore the documents shaping Belmont's transportation future.

Belmont 2035 General Plan

City of Belmont

Primary comprehensive plan establishing long-range transportation vision, including circulation policies, complete streets strategies, and multimodal network goals.

Adopted 2017
View Document → (opens in a new tab)

Belmont Climate Action Plan

City of Belmont

Establishes emission reduction targets and transportation-related measures including EV adoption, pedestrian/bicycle improvements, and sustainable mobility strategies.

Adopted 2017
View Document → (opens in a new tab)

Comprehensive Pedestrian & Bicycle Plan

City of Belmont

Citywide active transportation plan with bicycle network maps, pedestrian priority segments, and phased capital improvement projects consistent with Complete Streets Policy.

2016
View Document → (opens in a new tab)

Ralston Avenue Corridor Study

City of Belmont

Context-sensitive study evaluating multimodal adequacy on Belmont's primary E-W corridor — includes bike lane gap closures, pedestrian facility upgrades, and transit access improvements.

Approved 2014
View Document → (opens in a new tab)

Alameda de las Pulgas / San Carlos Ave Corridor Study

City of Belmont

Multi-agency complete streets project featuring three mini-roundabouts, sidewalks, bike lanes, and Safe Routes to School focus. Phase 1 construction scheduled 2025–2026.

2016
View Document → (opens in a new tab)

Belmont Village Specific Plan

City of Belmont

Downtown area plan for the 80-acre village designated as an MTC Priority Development Area — addresses Caltrain proximity, pedestrian linkages, bike lanes, and transit-oriented development.

Adopted 2017
View Document → (opens in a new tab)

Safe Routes to School Study

City of Belmont

Multi-agency effort to improve walking and biking to school, including sidewalk improvements along Alameda de las Pulgas corridor and intersection safety measures near school zones.

2012
View Document → (opens in a new tab)

Transportation Demand Management (TDM) Program

City of Belmont

Points-based system addressing transportation impacts of new development — requires pedestrian/bicycle environment improvements, transit support, and alternative transportation options.

Ongoing
View Document → (opens in a new tab)

San Mateo County Comprehensive Bicycle & Pedestrian Plan

County/Regional

County-level active transportation framework identifying priorities and projects for 21 jurisdictions including Belmont. Establishes consistent networks, equity focus, and shared micromobility integration.

2011; Updated 2021
View Document → (opens in a new tab)

San Mateo Countywide Transportation Plan 2040

County/Regional

Long-range county transportation plan establishing goals for all jurisdictions — emphasizes clean transportation, pedestrian/cycling pathways, and electric vehicle infrastructure.

Adopted 2017
View Document → (opens in a new tab)

Countywide Local Roadway Safety Plan

County/Regional

Data-driven safety framework to reduce traffic fatalities and injuries on local roads county-wide. Supports funding eligibility for roadway safety improvements in Belmont.

Adopted 2024
View Document → (opens in a new tab)

Countywide Sustainable Streets Master Plan

County/Regional

Integrates green stormwater infrastructure with active transportation and climate adaptation — prioritizes equity, vehicle-reduction, and urban heat mitigation.

2019
View Document → (opens in a new tab)

C/CAG Strategic Plan 2024–2029

County/Regional

Multi-year action roadmap for C/CAG's transportation, stormwater, and climate initiatives affecting all San Mateo County jurisdictions including Belmont.

2024
View Document → (opens in a new tab)

SamTrans Short Range Transit Plan

Transit

Five-year transit service plan for the regional bus operator covering fixed-route and paratransit services relevant to Belmont's transit connectivity and service planning.

FY2023–2028
View Document → (opens in a new tab)

Caltrain Modernization Program

Transit

$2.72 billion program modernizing rail with electric trains, signal upgrades, and Positive Train Control. Belmont Village is designated as a Priority Development Area near the station.

Electrification Completed 2024
View Document → (opens in a new tab)

Plan Bay Area 2050+

Regional

MTC's 9-county regional visionary plan with 35 strategies for equitable, resilient transportation. Establishes the framework for regional coordination influencing Belmont and San Mateo County.

2021; 2025 Update
View Document → (opens in a new tab)

Countywide Automated Vehicles Strategic Plan

County/Regional

San Mateo County's first AV strategic plan identifying regulatory framework, deployment strategies, equity considerations, and action plan for autonomous vehicle integration.

2021
View Document → (opens in a new tab)

California Transportation Plan 2050

State

Statewide plan addressing climate, new technologies, freight, and equity. Provides policy context for low-carbon mobility solutions applicable to all California jurisdictions.

2021
View Document → (opens in a new tab)

Caltrans District 4 Projects

State

State highway improvements in San Mateo County including SR-82 Roadway Renewal and US-101/SR-92 Interchange — affecting regional connectivity and traffic patterns through Belmont.

Various / Ongoing
View Document → (opens in a new tab)

Your Voice Shapes Belmont's Future

Stay connected, attend events, and make sure your neighborhood's needs are heard.

Project Contacts

City of Belmont Public Works
One Twin Pines Lane, Suite 385
Belmont, CA 94002